Controller or host platform
Provide the known equipment, drawing or constraint. Unknown items become factory review questions before quotation.
Cable assembly routes for controllers, backplanes, drives and storage platforms. Connector names alone do not prove direction, pinout, power arrangement or chassis fit.

Provide the known equipment, drawing or constraint. Unknown items become factory review questions before quotation.
Provide the known equipment, drawing or constraint. Unknown items become factory review questions before quotation.
Provide the known equipment, drawing or constraint. Unknown items become factory review questions before quotation.
Provide the known equipment, drawing or constraint. Unknown items become factory review questions before quotation.
Use the sequence as an RFQ preparation map. It does not define a wiring, pinout, protocol or platform-compatibility result.
Name the motherboard, HBA, RAID card, controller or adapter where the path begins.
↓Name the equipment or device role at the other end of the path.
↓Add both mating-interface references, photos, labels or drawings; mark unknown items.
↓Record straight-through, breakout or unknown. Do not infer wiring from connector appearance.
↓Add installed length, cable exit, bend path, chassis clearance and platform evidence.
↓Use the matching product family only when both endpoints fit; otherwise use Custom Cable RFQ.
Boundary: this is an equipment-path selection aid. Confirm exact connector geometry, direction, wiring, port order and compatibility from the platform manual, approved drawing or known-good cable evidence.

A connector photo alone may not prove direction or mapping. Add the host, target, chassis path, drawing or an existing sample so the build risks can be checked before quotation.
Choose a family only when it matches the actual endpoints. Otherwise start from the application and attach the available reference material.