Host, backplane and drive path
Identify the controller or motherboard, any intermediate backplane, and the U.2 devices at the target side.
Tell us the SFF-8654 8i host, number of U.2 drives, power arrangement, length and chassis route. We check the complete configuration before pricing.

Catalog reference P03-008 supports SlimSAS SFF-8654 8i to U.2 as a product configuration family. It does not establish universal device count, pinout, power arrangement, performance, length or platform compatibility.
You can begin with partial information. Unknown device count, power or topology becomes an explicit review question before quotation.
Identify the controller or motherboard, any intermediate backplane, and the U.2 devices at the target side.
Provide connector references, photos or drawings, including the number and arrangement of U.2 endpoints required.
Describe how the 8i-side lanes are expected to reach the U.2 targets. Mapping is reviewed from platform evidence.
State whether device power is part of the requested assembly and provide the applicable platform or wiring documentation.
Share connector orientation, cable exit, drive-bay access, routing space, bend constraints and target length.
Provide prototype quantity, forecast and whether the project is at design, validation, pilot or production stage.
A listing title or connector photo cannot prove that the cable fits the required controller, drives, power arrangement and chassis.
The cable terminates in a different number or arrangement of device-side connectors.
The assembly is expected to supply device power without matching the approved platform wiring.
The 8i-side lane allocation does not match the intended U.2 topology or backplane path.
Cable exit, connector orientation, bend radius or length obstructs installation and service.

Tell us whether the cable connects directly to U.2 devices or passes through a backplane or adapter. Add device count, power documentation, drive-bay layout and any serviceability constraints.
We start with the host, endpoints, drive count, quantity and available references.
Clarify lane distribution, backplane path, device power and mechanical constraints.
We coordinate the clarified configuration with a suitable factory.
We then recommend a quote or sample step that fits the project stage.
If U.2 is not the actual target, use the correct 4i, 8i or SATA breakout route instead of forcing this configuration.

Breakout direction, exit and SATA orientation can mismatch.
Review configuration →
Endpoint, orientation and breakout configuration vary.
Review configuration →
Space constraints and endpoint choice drive the requirement.
Review configuration →This section is for purchasing and engineering teams that have a real project, but may not yet have a complete drawing or final part number.
Use this RFQ route when the request calls for SlimSAS SFF-8654 8i to U.2 Cable Assemblies, or when the connector combination looks close but the host, target, direction, length or installation space still needs to be confirmed.
Drive count, power and topology need confirmation. A connector photo or marketplace title is not enough. The cable must match the equipment path and wiring direction.
Do not guess the connector family. Send what each end connects to, what the cable must do, and which detail is uncertain. We will reply with the exact items that need checking before quote.
Email, product/application and a short requirement are enough to open the RFQ. Drawings, photos or samples can be added later.
Request SlimSAS Quote →One clear OEM/ODM cable project path—from your requirement through engineering, sample approval and production.
Share your cable idea.
Confirm fit and details.
Approve scope and price.
Build and validate samples.
Manufacture the approved cable.
Check, pack and deliver.
| Stage | You provide | We coordinate | Result |
|---|---|---|---|
| 01 · Start | Application, equipment, connector photo or drawing | Review the requirement and list missing details | Clear RFQ scope |
| 02 · Develop | Answer technical questions and approve the sample | Coordinate drawing, quotation and prototype | Approved cable specification |
| 03 · Deliver | Release PO and confirm shipping information | Manage production, inspection, packing and shipment | Finished goods and documents |